Not logged in -
Login
Main Page
Categories
All pages
×
update division control max risk
Created on:
27/04/2018 1:28:01 PM
Created by:
admin
Last modified on:
27/04/2018 1:28:01 PM
Last modified by:
admin
View History
update division control max risk
What does the report show
This report runs the procedure cache.Division_Control_Max_Risk, which updates the maximum risk associated with any control for a particular division.
Back to
Reporting